Phase 1
Health and Safety

Phase 2
Â
Phase 1
Air Testing
Â
Material Safety Data Sheets
Â
Building Testing
Received date
Report Date
12-14-17
12-6-17
12-6-17
Attached below for your review are the re-test results for the 5 faucets in Room B110 at the Junior High School. The five faucets in question were replaced and re-tested, and results are below the threshold of 15.5. These faucets have been turned back on.
11-7-17
Test Date
10-24-17
10-16-17
11-6-17
Report Date
10-26-17
10-18-17
1-19-18
1-22-18
Â
Phase 2
Â
Air Testing
Â
Bid Specs
Â
Material Safety Data Sheets
Â